Opened 2026-10-06 · docs/v4.0.0/MESH.md section 10, steps 8-9
Step 8: the hosted product is the five nodes, on three ISAs (acceptance 1). Step 9: the same on bare metal (acceptance 6).
Reconstructed 2026-11-06 from the project record; Gitea dates every issue by when it is created.
**Opened 2026-10-06** · `docs/v4.0.0/MESH.md` section 10, steps 8-9
Step 8: the hosted product is the five nodes, on three ISAs (acceptance 1). Step 9: the same on bare metal (acceptance 6).
<sub>Reconstructed 2026-11-06 from the project record; Gitea dates every issue by when it is created.</sub>
rajames
added this to the v4.0.0 milestone 2026-11-06 19:05:48 +00:00
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Opened 2026-10-06 ·
docs/v4.0.0/MESH.mdsection 10, steps 8-9Step 8: the hosted product is the five nodes, on three ISAs (acceptance 1). Step 9: the same on bare metal (acceptance 6).
Reconstructed 2026-11-06 from the project record; Gitea dates every issue by when it is created.